Sr Supervisor Instrumentation
Sr Supervisor Instrumentation looking for employment in London
Objectives:
I am looking forward to take up a challenging assignment with a professionally managed organization of repute, where initiative and entrepreneurial sprits are encouraged and development opportunities are provided to people contributing to the success of the organization. I shall be pleased to attend a personal interview at your convenience.
Skills:
My multi-skill personality is the best asset for your organization that provides you a wide range of services. In this modern age my computing and electronic skill is play a key roll to maintain and managed your job requirements. I have sound knowledge and Varity of skill in the field of electronic /electrical automation and instrumentation and control systems. Well under stand and managed the construction and plant maintenance job as per its requirement. I have done a good experience on Glass Industry, R&D, Fertilizer Refinery Construction Refurbishment Revamping & Modification, crude and gas injection wellhead, gathering center they’re crude and gas storage separation handling and export work. Hands on experience of calibration servicing repair of preventive and corrective maintenance well familiar with installation of process control systems. Such as PLC, DCS and SCADA Based control and monitoring system. Using various type of test equipment such as DMM, tong tester, Meager, Wide range of DRUCK test and calibration equipment, Oscilloscope, signal generator and logic analyzer. Not only computer literate, I have very good experience in the computer field.
Work Experience:
KESCTHERMAL POWER STATION. Since 01Jan 2010SHUTDAWN JOB FOR TURBINE #3 AND #5. Worked as INSTRUMENT TECHNICIANCalibration and Servicing activity for all Instrumentation DESCON ENGINEERING LTD. 21 July 2008 To 31 Dec 2009PROJECT: REFURBISHMENT 115K BPD REFINEREYCLIENT: BOSICOR PAKISTAN.Contractor: DESCON ENGINEERINGAs a "SENIOR SUPERVISOR INSTRUMENT"Inspection Refurbishment Calibration and Job execution for the construction of 115k BPD REFINEREY.Inspection of instrument and equipment that remove from Gulf Refinery. Melbourne, U.KEstablished the site facility for the refurbishment of instrument and equipment. Workshop setup for job execution such as repair servicing and calibration of instrument.Manpower management and monitoring for the best output of the site facility MOODY INTERNATIONAL (18th Oct to 3rd Dec 2007) PROJECT: REHMAT-3 TI-IN PROJECT CLIENT: PETRONAS CARIGALI PAKISTAN.Contractor: PCL (Pipe Link Construction)As a “INSTRUMENT INSPECTOR”Inspection Monitoring and Job execution for the construction of Gas wellhead in witch Intech RTU panel, Alderley wellhead control panel, Rosecrrogien Methanol injector and corrosion inhibitor, Gas scrubber, Diesel Generator and BP Solar panel. FAUJI FERTILIZER BINQASIM LTD (Feb to May 2007)PROJECT: BALANCING MODIFICATION REVAMPINGAs a "INSTRUMENT TECHNICIAN"Modification Revamping and Construction of Benfield + LP boiler, Hydrogen Recovery Unit + SYN Gas Chiller, Air Blower with Modicon PLC and Infi 90 DCS.Installation Termination Loop testing.DESCON ENGINEERING QATAR L.L.C. (Aug 06 to Feb07)PROJECT: QATAR GAS3&4 ONSHORE PROJECT CLIENT: CTJV (CHIYODA-TECHNIP-JV/QGX)Contractor: DesconAs a "INSTRUMENT TECHNICIAN"Construction & Installation For EARLY PRODUCTION FACILITY.Manpower & Job Monitoring.SYSTAMATIC ENGINEERING SERVICES. (Apr to May 06)PROJECT: Makori I CLIENT: MOL PAKISTAN OIL AND GAS B.V.Contractor: PCL (Pipe Link Construction)As a "SUPERVISOR INSTRUMENT" With SES. Construction & Installation For EARLY PRODUCTION FACILITY, Installation of Separator, Heat Exchanger, Degasser, Scrubber, Glycol Regeneration Package, HP/LP Flare System and Gas Dehydration System. SEFEC. (10JAN TO 28DEC 2005) PROJECT: Lube II RevampCLIENT: NATIONAL REFINEREY LTD.Contractor: SEFECAs an "SUPERVISOR INSTRUMENT" With SEFEC With UEE Karachi Project Management For Installation Of Lube Oil Revamp Refining Project, National Refinery Limited. In This Project Our Scope Is That to Installation Of Sub Station Dilchill Crystallizer, Dehydrator, Rotary Vacuum Dewaxing Filter & Field / Control Room Instrumentation, Calibration, Hookup, Installation, Termination Loop testing & Commissioning. FFC. JORDAN FERTILIZER COMPANY LTD.(From 02 DEC to 28 Feb 2002)Worked as INSTRUMENT TECHNICIAN In Fauji Fertilizer Company Jordan. Bin Qasim. I have joined the DESULPHARIZATION PROJECT on contract basis.Control Systems: ABB Distributed Control Systems (DCS). HIMA Programmable Logic control system (PLC). ITT Furnace Control System.In this Construction project I involve in Mechanical Fabrication of instrument stand and their shades. Fabrication and installation of cable tray. Monitor and Managed the excavation works for cable laying. Termination, Loop Checking, Hock up and Field Calibration. KUWAIT OIL COMPANY (24 AUG 1999 to 05 JAN 2002)Working as INSTRUMENT TECHNICIAN. With Almeer Tech. Services. (ATSCO) For Maintenance Contract in Kuwait Control Systems: TDC 3000 of Honeywell Co. ABB Advent Controller 400 Series. Electronic gas Engine Control, Cooper Bissmer Co.Job Description & Responsibilities:During this job, I was engaged in the following jobs.Work Shop Experience: Calibration of pneumatic and electronic process control instruments. Servicing and overhauling of Regulator, Control valve and NELSES BJA Actuators. Troubleshooting and repairing of microprocessor based control or logic PCB’S.Field Experience: Maintenance of Wellhead instruments prepared the wellhead for Rig & after that reinstallation of SCADA instruments and equipment. Commissioning of seawater injection wellhead instruments.Process & Plant Experience: I have work on different sub-division of oil gathering center, like gas condensate recovery (gas compressor) crude dispatch pumps (turbine driven), crude / gas separator and oil heater. Also work on Ruston gas turbine of Booster station.Prepares schematics, drawings, sketches, and reports to reflect changes or alterations. Perform all schedule preventative maintenance as required by plant computer maintenance management system (CMMS / MMMS). NATIONAL INSTITUTE OF ELECTRONICS (NIE).(1995 TO 1999) Worked as SR. TECHNICIAN Projects: Artillery Computer System Lab (ACS) Electronic Instrument Lab (EIL/EIPC)Job Description & Responsibilities:ACS LAB: (3 YEARS)Worked with ACS (hard ware division). Bulk production of Battery computer, Forward observer device and Gun display unit, involve as technician. Start to end user product. Stuffing, soldering, assembling, testing and preparation of mechanical enclosure for performance test. Soldering, Stuffing, Testing, Repair, Maintenance and modification of Switch Mode Power Supply for ACS project. Schematic & PCB designing using PCAD for all types of Single & Double sided PCB’S.EIL / EIPC LAB: (1 ½ YEARS) Established the lab for EIL & EIPC. For practical application using modern equipment and associated peripherals.Functional testing, Hardware & Software installation of Digital Signal Processing (DSP320c 2x, 320c 5x) kit. PIC Emulator (16 c 71, 16 c 84), PIC Simulator and RICE 17A Emulator. Functional and hardware testing of PLC Mitsubishi Melsec (FXO), IDEC IZUMI (Micro-1), RS 232/RS 422 Converter and Fluke Scope Meter (105B, 99B).Responsibilities including conducting laboratory sessions with the practical application of technology, ensuring the lab equipment is serviceable and setup as required, conducting lab assments, assisting with marking and effecting simple repairs and maintaining equipment. BALUCHISTAN GLASS LTD. (1993 TO 1995)Served as JUNIOR SHIFT ENGINEER (Electronics) in Baluchistan Glass Ltd. at hub chowki, Baluchistan. Control System: Honeywell Process Control Systems. Erothrum Working End burner Control Systems. Ladladrew Oxygen monitoring systems.Job Description & Responsibilities:Erection maintenance worked on EMHART ETS (Electronic Timing System) machine. Also repairing of its Microprocessor control card.Worked on 120 Ton furnace Temperature, Level & Flow control systems.Installation and maintenance worked on optical fiber, multi – channel recorders and electronic controllers.A.C. & D.C. drives for speed control of variable speed motors. Starters for startup of heavy induction motors.
Education:
On Job Training as Trainee Engineer (Jr Shift Electronics Engineer) in the electrical department of Baluchistan Glass Ltd. One year Diploma in Industrial Electronics, from Sindh Board Of Technical Education, Karachi in 1993. Petroman Training Institute division of PERAC, Karachi. Specialized Engineering Program in Electronic Instrumentation Maintenance. Held in Petroman Training Institute, from 23 Oct- 29 Jan 1995. Short Course on Computer Hardware Maintenance from National Institute of Electronics, Islamabad in 1996. English Language course from National Institute of Modern Languages, Islamabad from 19 Jan – 22 May 1997. Short Course on Programmable Logic Controllers (PLC’s, S5-S7) From Usaman Institute of Technology, Hamdard University. On 14 June – 04 Aug 2002. Advanced Certificate on “Computer Control & Automation with Micro Controller 8051” from Usaman Institute of Technology, Hamdard University. On 14 Apr – 30 jun2003.Short Course on Primavera Project Planer P3 from Institute of Computer Science & Engineering. From 11th Mar-20th May 2005. Short Course on AUTOCAD 2D/3D From Institute of Computer Technology, in 2006.P. L. C Programming Languages in LADDER Diagrams.Computerized Maintenance Management System (CMMS/MMMS). Windows & Ms Office. PCAD (Schematic & PCB designing).PC Based temperature control system using interface technique with LM 35 opt-coupler relay, which is based on driving high watt heater as final project in Petroman. House No. H- 75/3
Malir Extension Colony
Karachi -75080
Pakistan
Phone Res: 92-021--4507226
Cell: 0306-2440176
E-mail: smajidh@hotmail.com
---------------------------