Manufacturing Engineer Instructor Sales Engineer Drafting
Manufacturing Engineer, Instructor, Sales Engineer, Drafting looking for employment in London
Skills:
▪ Adept in the use of Windows based applications (Word, Excel, PowerPoint, Outlook & Project)
▪ Practitioner of Lean Manufacturing System
▪ Basic Knowledge in the use of AutoCAD 2000 & Adobe Photoshop / Image Ready
▪ Proficient in documentation and records management
▪ Horizontal & Vertical Planning & Designing
▪ Possess strong people skills, sensitive to individuals and changing needs; proven to develop rapport with people
▪ Ability to individualize instruction, based on individuals’ interests and needs
Work Experience:
► Production Department Head ~ Section Chief 1
HKT-Philippines Inc.
Lot C2-1a Carmelray Industrial Park II
Brgy. Punta, Calamba City, Laguna Philippines
October 2008 – Present
▪ Accountable and liable to overall result of Production performance.
▪ Plan activities of Production Section.
▪ Set and review performance measures of Production Section.
▪ Check and review Failure Mode and Effect Analysis Status of Production Section.
▪ Initiate improvements on productivity and cost reduction.
▪ Oversees implementation of production procedure, standards and system in accordance to ISO 9001.
▪ Oversees the implementation of 5’S on machinery, maintenance and other areas.
▪ Monitor implementation of corrective action as well as application of preventive measures.
▪ Assesses and evaluates job performance of subordinates.
▪ Coordinates to Customer on matters that will affect quality, cost and delivery performance
▪ Demonstrate visible commitment and consistent adherence to the quality policy.
▪ Participates in the conduct of management reviews and preparation of strategies and programs for Production Section and the organization.
▪ Ensures that Advanced Product Quality Planning (APQP) is implemented on new product, process or design changes.
▪ Ensures timely and suitable corrective actions to customer complaints/feedback in coordination with concerned departments.
▪ Verify the Monthly Production reports of all supervisors that should be consisting correct information regarding production result, internal defects & countermeasures, line stoppage frequency, man-hour efficiency and overtime status
▪ Conducts & Monitor the implementation of Lean production System that aims to meets 3 goals, such as; Improve quality, eliminate waste & reduce lead time
▪ Participates in the conduct of management reviews and preparation of strategies and programs for the organization
▪ Conduct Seminars/Training/Meetings to employees regarding new system, rules or programs set by the management
Special Assignment/s:
EBESE 5S Good House Keeping & Productivity Improvement Program
[October 2008 – November 2008]
▪ Training & Formation of EBESE Project Team
▪ Preparation of Company formulated 5S Standard, Guidelines and Procedures
▪ Documentation of the current 5S Company Situation by taking pictures of model area (NICERA Line) before launching the 5S Program
▪ Implementation of 5S Program
▪ Document activities and improvements, highlighting quantifiable indicators of success such as savings in peso value, total work time, etc.
▪ Implementation of 5S Promotional Activities such as creating 5S Corner, 5S Posters, 5S Banners, 5S Slogans, 5S Handbook, etc.
▪ Conduct Monthly Regular 5S Audit
▪ Program Review and Evaluation
Seminars/Training Conducted within the Company:
TOPIC | DATE:
1. Lean Office Seminar | February 9,10 & 12, 2009
2. Root Cause Analysis Training | January 28-29, 2009
3. Over-all 5S Seminar & Corporate Quality Objective Awareness Seminar | January 9, 2009
4. Lean System Management Rules | November 11, 2008
► Lean Manufacturing ~ Assistant Section Chief 1
HKT-Philippines Inc.
Lot C2-1a Carmelray Industrial Park II
Brgy. Punta, Calamba City, Laguna Philippines
November 2007 – October 2008
▪ Conducts & Monitor the implementation of Lean production System that aims to meets 3 goals, such as; Improve quality, eliminate waste & reduce lead time
▪ Participates in the conduct of management reviews and preparation of strategies and programs for the organization
▪ Company / production layout documentation
▪ Conducts periodic patrol of operations to ensure that it conforms to all standards
▪ Conducts cycle time study, cost projection and work load balancing
▪ Assesses and evaluates job performance of subordinates
▪ Oversees the implementation of 5’S in the company
▪ Conduct Seminars/Training/Meetings to employees regarding new system, rules or programs set by the management
Seminars Conducted within the Company:
TOPIC | DATE;
1. Policy Deployment Seminar 1.2 & 4M Seminar | September 9, 2008
2. Policy Deployment Seminar 1.1 | August 7, 2008
3. A Journey to Lean | November 26, 2007
► Systems Improvement Department ~ Systems Engineer / Assistant-to-the-Vice-President / Lean Manufacturing Consultant
Yazaki-Torres Mfg. Inc. / Torres-Tech / HKT-Philippines Inc.
Calamba City, Laguna Philippines
July 2006 – October 2007
▪ Prepares all document reports of the Vice-President to the President
▪ Prepares all presentation documents to be discussed by the Vice-President in his seminars and meetings
▪ Secretariat
▪ Conduct research for the Vice-President’s Initial Drafts of projects
▪ Coordinates to all DCS for managers’ report to the vice-president
▪ Maintains & Compiles Entranet-Shared Files of Manufacturing Documents to make sure it is updated and to be submitted to the Vice-President daily
▪ Encode all proposed checksheet, checkpoints, Manufacturing plans and strategies
▪ Analyze customer claims and conducts 5 Why Analysis
▪ Accomplish special projects of the Vice-President
Special assignments:
1. Lean Transformation Consultant of HKT-Philippines Inc.
[March 2007 – October 2007]
▪ Conducts Seminars to Middle Management Personnel regarding Lean Manufacturing System
▪ Discuss the Objective Setting of the Project
▪ Creates the Team formation
▪ Selection of Production Pilot Area
▪ Conducts Value Stream Mapping
▪ Insures the Planning And Implementation is well coordinated to every concerned personnel
▪ Conducts the Analysis of Results and Reports it briefly to the Vice-President of Yazaki-Torres Mfg. Inc.
▪ Prepares the Standardization Documents / Standards
▪ Assures Continuous Improvement
2. Improved NAKAMUKI Stripping Machine
[January 2007 - March 2007]
▪ Investigate & Analyze the Innovative Project of Top Management
- Current State Mapping within the affected processes
- Identify possible defective occurrence [FMEA]
- Conduct trials to the new improved machine
- Identify Kaizen Bursts [Eliminated Downtime and Possible Change of Process]
- Illustration of Before and After Kaizen
- Production Re-Layout
- Analysis of Results and Standardization
▪ Prepares the Presentation Documents
▪ Conducts the presentation of improvements to the quarterly AJS-UP meeting
3. Pre~Assy-Assembly-Alignment (PAA) Conveyor Expansion Project
[September 2006 – December 2006]
▪ Conduct Surveillance within the Manufacturing 1
▪ Illustration of all machineries & equipments within the Floor Plan
▪ Conduct Trial & errors for the project
▪ Presentation of Proposed Lay-out to the Vice-President
▪ Conduct meeting to all Managers / Department Heads
▪ Assist in the initial implementation of the project
4. New Conveyor Management System
[June 2006 – August 2006]
▪ Conducts the Current State Mapping Process
▪ Work Load Balancing
▪ Prepares the Presentation Documents of the Improvements and the New System itself
▪ Conducts the presentation proper of the said New System with all employees with the President during the Compartmentalization Period within the Company
5. Japan Project Team
[April 2006 – May 2006]
▪ Assisting YTMI-Japanese Support Group
▪ Take initial internal audits concerning on process flow, 5S and on Areas where Outrageous Defects originates
▪ Summarizes data and initial reporting to YTMI-Japanese SG Team leader
▪ Conduct meeting with the concerned department personnel
▪ Target dates of improvement plan and action
▪ Project Completeness Checksheet Updates
► Systems Improvement Department ~ Office Staff / Engineer
Yazaki-Torres Mfg. Inc.
Bo. Makiling, Calamba City, Laguna Philippines
May 2006 – July 2006
▪ Conducts Value Stream Mapping within the Production Area
▪ Identify & Illustrates the Kaizen Burst for the elimination of possible 7 Wastes within the processes
▪ Proposal and presentation of a Future State Map
▪ Coordinate with the Section Heads, Supervisors & Area Leaders of the affected area for the discussion and implementation of the said improvements
▪ Monitor & report the status of the effectiveness of every improvements to the department head
► Industrial Engineering Department ~ Office Staff
Yazaki-Torres Mfg. Inc.
Bo. Makiling, Calamba City, Laguna Philippines
November 2005 – May 2006
▪ Prepares and revises crimping standards of all specific products [CD-Cars, L42A Altima, US Mazda (030 & 050), P221, Engine Jaguar, Old Corolla, Corolla (344W, 363W & 297W), Estima 271W, Spacio 400W, Hi-Ace 286W, Alphard 337W, Rav-4 338W, Mitsubishi, Daihatsu, Japan Mazda, & Honda]
► Apprentice to Probationary Period
Yazaki-Torres Mfg. Inc.
Bo. Makiling, Calamba City, Laguna Philippines
May 2005 – October 2005
▪ Assigned to Manufacturing Line for Basic Knowledge of Wiring Harnesses
▪ Observation and documentation of actual procedure versus standard
▪ Hands-on to specific processes such as; Taping process, Attachment of Grommet, terminal Insertion and wire setter.
► Assistant Engineer / Sales Representative
St. Morris Enterprise
Sta.Cruz, Laguna Philippines
April 2004 – April 2005
▪ Obtain project management
▪ Responsible for bringing the project from design stage to final implementation stage
▪ Monitor and ensure the development as per the specification and without violating government standards.
▪ Coordinate and supervised foreman, contractors and staff
▪ Analyze daily activity reports
▪ Ensure Cost evaluation is kept on the minimum and without losing the quality and efficiency
▪ Compiles all transaction, BOM, invoices and other reports.
► Faculty Staff / Adviser
St. Martin of Lisieux School and Business High School
Sto. Angel Central
Sta.Cruz, Laguna Philippines
June 2003 – June 2004
▪ Prepares Lesson Plans for Algebra & Basic Accounting Subjects
▪ Create a highly motivated classroom that can efficiently approach students’ interests that can make effective learning hours
Education:
1. Bachelor of Science in Civil Engineering
University of Perpetual Help System – Laguna
Binan, Laguna Philippines
1997 – 2002
Member of the Philippine Integrated of Civil Engineers (PICE) 2000
---------------------------